Pro AV Catalog
10550 Camden Drive
Cypress, CA 90630
United States

Christie

Christie, a leader in high-performance display solutions for professional markets, is recognized as one of the most innovative manufacturers of projection systems and multi-windowing processors. Christie consistently sets the standard by being first to market with some of the most advanced projectors and complete system solutions – all backed by industry-leading warranties, service and support.

Model: CP2411-RBe

Upgrade your small-screen cinema to the Christie CineLife+™ CP2411-RBe DCI-compliant projector for enhanced laser phosphor illumination. Our new CineLife+2K™ electronics are designed specifically for
Featured Product
Project List
Hexogon Solution deploys Christie Boxer 4K30 Projectors for Singapore’s 51st National Day celebrations
Posted on Wednesday, August 10, 2016
This marks the debut of Boxer 4K30s at the new National Stadium for the biggest tracking projection mapping performance ever

SINGAPORE – (August 10, 2016) –Christie® visual solutions delivered spectacular visuals that captivated over 55,000 spectators who attended Singapore’s 51st birthday celebrations at the new National Stadium on August 9, 2016. The stunning projection mapping performances were planned and executed by Christie’s rental staging partner Hexogon Solution Pte Ltd.

A total of 66 Christie Boxer 4K30 3DLP® projectors were installed around the 4th level of the stadium to claim the biggest real-time tracking 3D projection mapping show in the world for this National Day Parade (NDP) in Singapore. A slew of bright and vibrant visuals projected onto the surfaces of the two moving structures by the Boxer 4K30s greatly enhanced the scale and excitement of the celebrations. This marks the debut of Christie Boxer 4K30s at the National Stadium since the completion of this state-of-the-art sports facility in 2014.

 

Vibrant visuals on the 3D Sky City are projected by the Christie Boxer 4K30 projectors
(All photos courtesy of Hexogon Solution Pte Ltd)

 

Adrian Goh, Group Managing Director, Hexogon Solution, said, “This is the first real-time tracking projection mapping on 3D objects at the NDP. Forty tracking cameras around the entire stadium and 260 tracking beacons were installed onto the boulder and the 3D Sky City, to enable the system to accurately track and map the visuals provided by the committee onto all surface of the structures as the objects move. The giant boulder would eventually be split into eight pieces and travel in different directions, while the 3D Sky City – made up of 15 gigantic collapsible fabric structures with an overall size of 60 meters in diameter and 20 meters in height – would be hoisted from stage level to a height of 35 meters during the Parade’s finale.”

According to Goh, the challenges faced by his team were the very short time allotted for calibration and alignment, as well as unpredictable on-site conditions. “We had to map on empty space without the actual objects in the initial stage; and only less than a week for actual mapping onto the complex structures after they were installed. In addition, we had to deal with the random movements of the fabric structure due to wind conditions, whilst executing and rendering the content in real-time on uneven deformed surfaces.”

 

Hexogon Solution delivered the biggest real-time tracking 3D projection mapping show in the world for this year’s National Day Parade

 

Tapping on the valuable experience gathered during its involvement in previous NDPs and last year’sSouth East Asian sporting event that accomplished a new Guinness World Records title for the greatest light output in a projected image, the Hexogon team successfully overcame the challenges to deliver another outstanding show for the nation’s birthday.

“The Christie Boxer 4K30 is easy to handle and it allows us to spread the projected image without compromising the result. With strong features such as 4K resolution, 30,000 lumens, a significantly smaller footprint and omnidirectional capability, it was a breeze to position the projectors in different angles to cover the whole Sky City structure. On the other hand, the sheltered environment of the National Stadium is definitely a better location for both equipment and people to work in, as compared to the fully outdoor Marina Bay Floating Platform that was used for staging previous NDPs,” Goh said.

The result was a mesmerizing NDP extravaganza that featured over 3,500 performers on an enormous stage about the size of nine basketball courts, colorful indoor fireworks, larger-than-life props hanging from the roof and a unique song-signing segment featuring familiar NDP tunes.

 

close